Toyo Engineering Corporation and SOG Oil & Gas are two firms that both design and build complex engineering projects. They formed a joint venture in 2012 and created Toyo Setal. This company builds onshore industrial complexes across Brazil. It has a sister company dedicated to building offshore complexes. Its two parent companies each own 50 percent of it.

The types of industries Toyo Setal builds facilities for are petrochemicals, oil and gas, mining, energy, and chemical. Since their projects are highly complex they needed to build a highly robust project management software solution. This is the EPC portal through which all of their operations are accounted for. EPC helps management and employees keep track of everything on a single online platform. Read more reviews at indeed.com

EPS led to such an increase in efficiency that it was awarded at the 2014 AVEVA World Summit. This software package was celebrated at a ceremony that took place in Berlin, Germany. The award granted was the “Innovations in Engineering Project Integration.” It was hailed as the best solution in the category “Challenges and Advances in Integrated Technology.”

Its biggest client is Petrobras, the largest oil & gas firm in Brazil. Toyo Setal has built several facilities for them with the largest one in Itaborai, Rio de Janeiro. This facility, completed in 2016, consists of two hydrogen production units and a substation, all inside the Rio de Janeiro Petrochemical Complex (COMPERJ).

The work Toyo Setal performed on this project included electromechanical assembly, executive design, pre-commissioning, testing, civil works, and start-up assistance. The complex uses heavy oil produced in the Campos Basin near the South Atlantic and turns it into petrochemicals and light oil. There is a growing demand for both of these products in Brazil.

Toyo Setal was recognized for its work for Petrobras who awarded them the “Best Supplier Petrobras 2018” designation. It had exceeded expectations on an important facility, the FPSO P-74 project, which it completed almost two months ahead of schedule.